# KANZ — Assignment of Sales Order Items to Costing Objects

> Records which cost estimates a sales order item is linked to in sales order costing: sales document, item, top-level cost estimate, material cost estimate and BOM item node. Teams in make-to-order production use it to follow the cost structure of a sales order item. Use KALNR_TOP and KALNR_MAT to move to KEKO/CKIS for the cost details of the item.

- Modules: CO
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/kanz/

## Main fields

| Field | Description | Key |
|---|---|---|
| VBELN | Sales document number | Yes |
| POSNR | Sales document item | Yes |
| KALNR_TOP | Top-level cost estimate number | Yes |
| KALNR_MAT | Material cost estimate number | Yes |
| STLKN | BOM item node number | Yes |

## Reports using this table

