# MDVL — Planning File Entries for Long-Term Planning

> Holds the planning file entries that tell long-term planning (planning scenarios) which materials to plan. Each scenario is separated by PLSCN; the net change and re-explode BOM indicators control the next run of the scenario. In systems without long-term planning the table is empty.

- Modules: PP
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/mdvl/

## Main fields

| Field | Description | Key |
|---|---|---|
| MAFID | Record type | Yes |
| MDKEY | Total key | Yes |
| PLSCN | Planning scenario | Yes |
| GSAEN | Net change planning | - |
| RESAL | Re-explode BOM | - |
| RESDT | Reset procurement proposals | - |
| ERDAT | Created on | - |

## Reports using this table

