# PBED — Independent Requirements Data

> Holds the dated schedule lines of planned independent requirements: date, planned quantity, withdrawal quantity and period indicator. It links to PBIM through BDZEI. As sales orders or goods issues consume the requirement, ENTMG increases; the remaining planned quantity is PLNMG minus ENTMG.

- Modules: PP
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/pbed/

## Main fields

| Field | Description | Key |
|---|---|---|
| BDZEI | Independent requirements pointer | Yes |
| PDATU | Delivery/order finish date | Yes |
| PLNMG | Planned quantity | - |
| ENTMG | Withdrawal quantity | - |
| MEINS | Base unit of measure | - |
| ENTLU | Period indicator (day, week, month, posting period) | - |
| PERXX | Planning period | - |

## Transactions working with this table

MD61, MD62, MD73, MF50

## Reports using this table

