# PLMZ — Allocation of BOM Items to Operations

> Holds the BOM components allocated to routing operations (component allocation): which BOM item is consumed at which task list node and sequence. The component material number is not stored here but in STPO; the link uses STLTY, STLNR, STLAL and STLKN. Components without an allocation are assigned to the first operation when the order is created.

- Modules: PP
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/plmz/

## Main fields

| Field | Description | Key |
|---|---|---|
| PLNTY | Task list type | Yes |
| PLNNR | Key for task list group | Yes |
| ZUONR | Allocation number for material components | Yes |
| ZAEHL | Internal counter | Yes |
| PLNFL | Sequence | - |
| PLNKN | Task list node number of the operation | - |
| STLTY | BOM category | - |
| STLNR | Bill of material | - |
| STLAL | Alternative BOM | - |
| STLKN | BOM item node number | - |
| DATUV | Valid-from date | - |
| LOEKZ | Deletion indicator | - |

## Transactions working with this table

CA01, CA02

## Reports using this table

