QM
Transparent table
Used the same way in S/4HANA
QPRVK Sample-Drawing Procedure
Holds sample-drawing procedures per version, which define how physical samples are drawn: valid-from date, whether the sample drawing must be confirmed and whether the number of containers is considered. The procedure assigned to the inspection plan drives the creation of physical samples (QPRS) for an inspection lot. In setups without physical samples the table is empty.
Main fields
| Field | Description | Key |
|---|---|---|
| PRZIEHVERF | Sample-drawing procedure | Yes |
| VERSION | Version | Yes |
| GUELTIGAB | Valid from | — |
| KZQUIT | Confirmation required | — |
| GEBANZ | Consider number of containers | — |
| ERSTELLER | Created by | — |
| DATUMERST | Created on | — |
Transactions working with this table
Reports using this table
No report using this table has been added to the catalog yet.
Can't find the report you need?
We also build anything that is not in the catalog. Describe it briefly and we will suggest the right solution.