# QPRVK — Sample-Drawing Procedure

> Holds sample-drawing procedures per version, which define how physical samples are drawn: valid-from date, whether the sample drawing must be confirmed and whether the number of containers is considered. The procedure assigned to the inspection plan drives the creation of physical samples (QPRS) for an inspection lot. In setups without physical samples the table is empty.

- Modules: QM
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/qprvk/

## Main fields

| Field | Description | Key |
|---|---|---|
| PRZIEHVERF | Sample-drawing procedure | Yes |
| VERSION | Version | Yes |
| GUELTIGAB | Valid from | - |
| KZQUIT | Confirmation required | - |
| GEBANZ | Consider number of containers | - |
| ERSTELLER | Created by | - |
| DATUMERST | Created on | - |

## Transactions working with this table

QPR4

## Reports using this table

