# S023 — SFIS: Totals Records for Material

> It is a LIS information structure of the Shop Floor Information System (SFIS). It holds the number of production orders, target, planned and actual lead times and queue times per material and MRP controller as period totals. It is used to track lead time deviations per material. Actual data is in version 000.

- Modules: PP
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/s023/

## Main fields

| Field | Description | Key |
|---|---|---|
| SSOUR | Statistics origin | Yes |
| VRSIO | Version | Yes |
| SPMON | Month | Yes |
| SPTAG | Date | Yes |
| SPWOC | Week | Yes |
| SPBUP | Posting period | Yes |
| WERKS | Plant | Yes |
| MATNR | Material | Yes |
| DISPO | MRP controller | Yes |
| ANZFA | Number of production orders | - |
| P_DLZ | Planned lead time | - |
| S_DLZ | Target lead time | - |
| I_DLZ | Actual lead time | - |
| I_WTZ | Actual queue time | - |
| LMEIN | Base unit of measure | - |

## Reports using this table

