# T352R — Maintenance Revisions

> Holds maintenance revisions (planned shutdowns) per planning plant with their start and end dates and times. Planners who group maintenance orders by shutdown period and shutdown reports use this table. Orders link to a revision via AFIH-REVNR; the key is IWERK + REVNR, so always read the planning plant as well.

- Modules: PM
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/t352r/

## Main fields

| Field | Description | Key |
|---|---|---|
| IWERK | Planning plant | Yes |
| REVNR | Revision | Yes |
| REVTX | Revision description | - |
| REVBD | Revision start date | - |
| REVBZ | Revision start time | - |
| REVED | Revision end date | - |
| REVEZ | Revision end time | - |
| REVAB | Revision completed | - |

## Reports using this table

