# T430 — Operation Control Key

> Defines the control keys for operations in routings, inspection plans and maintenance task lists, per task list application. Among other things, the key decides whether an operation is scheduled, confirmed, processed externally or requires inspection characteristics. PLPO-STEUS and AFVC-STEUS point to this table.

- Modules: PP
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/t430/

## Main fields

| Field | Description | Key |
|---|---|---|
| PLNAW | Application | Yes |
| STEUS | Control key | Yes |
| TERM | Scheduling | - |
| RUEK | Confirmations | - |
| LIEF | External processing | - |
| AUTWE | Automatic goods receipt | - |
| MRKKZ | Inspection characteristics required | - |
| PKOST | Relevant for costing | - |

## Reports using this table

