# CC02 — Change Change Master

> Changes the description, status, valid-from date and object type assignments of an existing change master. Engineering teams that manage the change process use it. Once the change number is used on objects, changing its valid-from date also changes their validity.

- Modules: CA
- Program: SAPMC29C
- S/4HANA status: Also used in S/4HANA

- Related tables: AENR, AEOI
- URL: https://nekuhub.com/en/transactions/cc02/
