# CJ21 — Change Basic Dates

> Changes the basic start and finish dates of WBS elements in a structure overview. In projects without networks, scheduling is done with this screen. The dates are held in table PRTE.

- Modules: PS
- Program: SAPLCJTR
- S/4HANA status: Also used in S/4HANA

- Related tables: PROJ, PRPS, PRTE
- URL: https://nekuhub.com/en/transactions/cj21/
