# CJ44 — Actual Overhead: Projects, Individual Processing

> Calculates and posts actual overhead surcharges for one project based on the costing sheet. Project controllers run it during period-end closing, before settlement. No overhead is calculated if the WBS element has no costing sheet.

- Modules: PS
- Program: SAPLKAZB
- S/4HANA status: Also used in S/4HANA

- Related tables: COEP, COSS, PRPS
- URL: https://nekuhub.com/en/transactions/cj44/
