# CJ45 — Actual Overhead: Projects, Collective Processing

> Calculates and posts actual overhead for many projects collectively, based on a selection variant. It is usually part of the period-end closing schedule as a background job. When run again for the same period, only the difference is posted.

- Modules: PS
- Program: SAPLKAZB
- S/4HANA status: Also used in S/4HANA

- Related tables: COEP, COSS, PRPS
- URL: https://nekuhub.com/en/transactions/cj45/
