# CJ8G — Actual Settlement: Projects/Networks (Collective)

> Settles the actual costs of many projects and networks collectively, based on a selection variant. During period-end closing it is usually scheduled as a background job. Objects with errors are listed separately and can be corrected and rerun one by one with CJ88.

- Modules: PS
- Program: SAPLKO71
- S/4HANA status: Also used in S/4HANA

- Related tables: AUAK, COBRA, COBRB, COEP, PRPS
- URL: https://nekuhub.com/en/transactions/cj8g/

## Where this transaction falls short

