# CJI9 — Project Structure Planned Costs Line Items

> Lists planned cost line items from structure planning for WBS elements and networks. It is used to see at line-item level which changes built up the plan values. Plan line items are read from CO plan line item tables such as COEJ.

- Modules: PS
- Program: RKPEP009
- S/4HANA status: Also used in S/4HANA

- Related tables: COEJ, PRPS
- URL: https://nekuhub.com/en/transactions/cji9/
