# CO01 — Create Production Order

> Creates a production order manually from material, plant and order type; the system reads the BOM and routing and copies components and operations into the order. Production planners use it for urgent production that does not come from a planned order. If no BOM or routing is found the order may be incomplete, so check the component and operation screens before saving.

- Modules: PP
- Program: SAPLCOKO1
- S/4HANA status: Also used in S/4HANA

- Related tables: AFKO, AFPO, AFVC, AUFK, RESB
- URL: https://nekuhub.com/en/transactions/co01/
