# IE4N — Equipment Installation and Dismantling

> Installs equipment at a functional location or superior equipment and dismantles it, optionally combined with a goods movement. Technicians and warehouse staff use it to update the location and stock status of exchanged parts in one step. Each installation or dismantling creates a new time segment in EQUZ, which is where past installation locations are traced.

- Modules: PM
- Program: SAPLIPW4
- S/4HANA status: Also used in S/4HANA

- Related tables: EQUI, EQUZ, IFLOT, ILOA
- URL: https://nekuhub.com/en/transactions/ie4n/
