CO
Standard SAP
Replaced in S/4HANA
KA01 Create Cost Element
Creates a primary cost element for an existing G/L account or a secondary cost element for allocations, with its category and validity period. Without a cost element, postings to the account do not reach Controlling. Choose the category carefully, because it controls which transactions may use the cost element.
Program: SAPLKMA4
S/4HANA status: Replaced in S/4HANA
In S/4HANA cost elements are part of the G/L account master and are created with FS00.
Replaced by: FS00
Related tables
Can't find the report you need?
We also build anything that is not in the catalog. Describe it briefly and we will suggest the right solution.