# KA06 — Create Secondary Cost Element

> Creates a secondary cost element that is used only within CO, for example for settlement, assessment or activity allocation. Controlling teams use it when they set up the CO allocation structure. The cost element category (for example 21 settlement, 42 assessment, 43 activity allocation) becomes tied to postings and cannot easily be changed later, so choose it carefully.

- Modules: CO
- Program: SAPLKMA4
- S/4HANA status: Replaced in S/4HANA (Replaced by: FS00)
- In S/4HANA secondary cost elements are created with FS00 as G/L accounts of type secondary costs with a cost element category.
- Related tables: CSKA, CSKB
- URL: https://nekuhub.com/en/transactions/ka06/
