# KKBC_MAT — Analyze Material Cost Estimate

> Opens the report that analyses a material cost estimate at cost component and item level. Cost accountants use it to explain which material, activity and overhead items make up a standard cost. The report is defined as a parameter transaction; if the costing variant and version are not chosen correctly, an outdated estimate may be shown.

- Modules: CO

- S/4HANA status: Also used in S/4HANA

- Related tables: CKIS, KEKO, KEPH
- URL: https://nekuhub.com/en/transactions/kkbc-mat/
