# KP46 — Change Statistical Key Figure Plan Data

> Enters planned statistical key figure values for cost centers, such as planned head count or floor space. Controlling teams use it to prepare the tracing factors for plan assessment and distribution cycles. Values are totalled in COSR with the plan value type and must be entered before the plan cycle is run.

- Modules: CO
- Program: RKCCAPLN
- S/4HANA status: Also used in S/4HANA

- Related tables: COSR, TKA03
- URL: https://nekuhub.com/en/transactions/kp46/
