# LB01 — Create Transfer Requirement

> Creates a transfer requirement manually; it is converted into a transfer order later. It is used to plan production supply or internal moves in advance. Most transfer requirements are created automatically by IM movements; manual creation is for exceptions.

- Modules: WM
- Program: SAPML02B
- S/4HANA status: Changed in S/4HANA
- It still runs in S/4HANA, but LE-WM is in the compatibility scope and not the target architecture; SAP EWM is the successor, while Stock Room Management keeps a reduced LE-WM scope.
- Related tables: LTBK, LTBP
- URL: https://nekuhub.com/en/transactions/lb01/
