# LS11 — Change Several Storage Bins Simultaneously

> Changes fields such as blocks, storage section or bin type for the selected storage bins in bulk. It saves time when closing a zone or reorganizing. Checking the selection list before the mass change prevents wrong updates.

- Modules: WM
- Program: RLLS0600
- S/4HANA status: Changed in S/4HANA
- It still runs in S/4HANA, but LE-WM is in the compatibility scope and not the target architecture; SAP EWM is the successor, while Stock Room Management keeps a reduced LE-WM scope.
- Related tables: LAGP
- URL: https://nekuhub.com/en/transactions/ls11/
