# QA02 — Change Inspection Lot

> Changes data of an existing inspection lot such as quantity, short text or plan assignment. It is used to assign a plan after lot creation or to repeat the sample calculation. Once a usage decision has been made, many fields can no longer be changed.

- Modules: QM
- Program: SAPLQPL1
- S/4HANA status: Also used in S/4HANA

- Related tables: JEST, QALS, QAMV
- URL: https://nekuhub.com/en/transactions/qa02/
