QM
Standard SAP
Also used in S/4HANA
QP02 Change Inspection Plan
Changes the operations, characteristics and material assignments of an existing inspection plan. Changes made with a change number can be tracked by date. Specifications in existing inspection lots are copies in QAMV and are not affected by plan changes.
Program: SAPLCPDI