# QP02 — Change Inspection Plan

> Changes the operations, characteristics and material assignments of an existing inspection plan. Changes made with a change number can be tracked by date. Specifications in existing inspection lots are copies in QAMV and are not affected by plan changes.

- Modules: QM
- Program: SAPLCPDI
- S/4HANA status: Also used in S/4HANA

- Related tables: MAPL, PLKO, PLMK, PLMW, PLPO
- URL: https://nekuhub.com/en/transactions/qp02/
